Peninsula Clean Energy Authority is soliciting offers for shaped and block energy
(volumes and shape defined in Exhibit A of the attached Bid Workbook) for Q3 2021, Q4 2021, and calendar years 2022 through 2024.

Indicative pricing is due by 9 am PPT on March 26ika at final pricing is due by 9 am PPT on March 31st with a three hour hold period until 12 pm PPT. For Q3 2021, Q4 2021, and for each calendar year, Peninsula Clean Energy may procure either shaped or block products to fulfill its open position and targets.

Ang mga hugis at block na produkto ng hedge na hinihiling ng Peninsula Clean Energy na mga alok ay higit pang tinukoy sa sumusunod na paraan:

  • Hugis na Enerhiya: Ang napiling supplier ay mananagot para sa paghahatid ng kuryente sa alinman sa NP15 EZ Gen Hub o DLAP_PGAE-APND (“Delivery Point”) sa pamamagitan ng pag-iskedyul ng isang CAISO day-ahead Inter-SC Trade (“IST”). Dapat hubugin ng mga nagmumungkahi ang mga paghahatid ng enerhiya upang tumugma sa inaasahang profile ng oras-oras na pagkarga ng Peninsula Clean Energy (matatagpuan ang mga profile sa buwanang karaniwang araw at katapusan ng linggo sa Exhibit A sa loob ng nakalakip na Bid Workbook).
  • Block Energy: The selected supplier shall be responsible for electric energy delivery to either the NP15 EZ Gen Hub or DLAP_PGAE-APND (“Delivery Point”) through the scheduling of a CAISO day-ahead Inter-SC Trade (“IST”). Please complete Exhibit B (NP-15 Delivery Point) and Exhibit C (PG&E DLAP Delivery Point) in the attached Bid Workbook with your offer for block energy. Peninsula Clean Energy is soliciting offers for the following five block products:
    • ATC Block (7×24)
    • Panggabing Block HE 17 – 22
    • Evening Block HE 19 – 22
    • On-peak Block (HE 7-22, Lunes – Sabado)
    • Off-peak Block (HE1-6 & HE 23-24, Monday – Saturday, and ATC Sundays)

 

Ang iba pang mga komersyal na tuntunin ng deal na dapat isama sa mga alok ay ang mga sumusunod:

  • Delivery Point:
    • DLAP_PGAE-APND at TH_NP15_GEN-APND gaya ng tinukoy ng CAISO (hinihiling ng Peninsula Clean Energy ang pagpepresyo sa parehong lokasyon).
  • Pagpepresyo:
    • Buwanang pagpepresyo sa $/MWh;
    • Peninsula Clean Energy plans to transact Q3 2021, Q4 2021 separately, and calendar year strips for 2022 – 2024.
      • Each timeframe (e.g. Q3 2021, Q4 2021, 2022, 2023 and 2024) must be priced independently. Peninsula Clean Energy may not accept offerings that do not price calendar years independently.
  • Mga volume: Tinutukoy ang mga volume sa nakalakip na Bid Workbook
  • Termino ng Paghahatid: Q3 2021, Q4 2021, 2022 – 2024. Offers must have a minimum delivery term of isa calendar year for 2022 – 2024. As further noted above, calendar years will be evaluated independently. Offers that require delivery terms longer than one calendar year will not be accepted.
  • Kasunduan sa Pagkumpirma: Nakalakip ang karaniwang anyo ng kumpirmasyon ng Peninsula Clean Energy para sa hugis at harang na mga transaksyon sa enerhiya. Please provide redline with indicative bids on March 26, 2021 at 9:00 AM PT.
  • Suporta sa Credit ng Mamimili: Peninsula Clean Energy will rely on its investment-grade credit rating for this transaction.
  • Ginustong Mga Tuntunin sa Pagbabayad: Invoice dahil sa Peninsula Clean Energy ng 10ika ng buwan pagkatapos ng paghahatid at pagbabayad dahil sa supplier sa pamamagitan ng 25ika ng buwan pagkatapos ng paghahatid ng invoice.

Mga download

Mangyaring ipadala ang iyong alok sa mga sumusunod na email address:

Thank you for participating in Peninsula Clean Energy’s supply solicitation and please reach out to the emails above throughout the process with any questions that you may have.